Month: December 2011
BAM
Moving Along
Sheetrock done
So at HD yesterday morning we realized the 7.5″ grinder and several masonry blades could get the floors where we want them. The hardest part of the process was removing the left over material from the linoleum. After spending all day on our knees, we finished the kitchen, living room, bathroom, and the hall.
I managed to slice into my knee with about a one foot square of floor left, so Greg had to finish. I’m fine and there wasn’t much carnage, but the cut being on my knee is a problem for walking and bending. Lesson learned.
Today the electricians finished moving lightswitches and wiring the new cable, while Greg sheetrocked the rest of the closet and made all the small patches throughout the house.
More pictures soon!
Grinding fail
Finally
Today we finally got the house, it has been a trying 4 months. Thanks to everyone for your thoughts and kind words.
The electrician came and started moving lights and adding them. Gabriel and crew showed up and began properly scrapping the ceiling. We found out that we needed to scrape more or the skim-coat would bubble and look really bad.
Greg and I did some insulating and dry-wall work in the kitchen and in my closet.












