Tuesday
First we ground all the nail heads left over from the floor tack off. Greg started blocking out Chad’s closet and sealed the hole in the wall left from removing the swamp cooler duct. We finally started patching all the small holes from the old phone lines, speakers, and other random things that we are not going to be needing.
We put the old toilet, swamp cooler, stove, and stacks of particle board out for trash tomorrow. Not 10 minutes after we came back inside did someone stop and picked up the stove and swamp cooler. Wish we had know someone was going to take it so fast, we could have put other things out for trash. we can only put out 4 large items a week, oh well.
Greg met the mail lady, and she seemed exciting that we were moving in.
At the end of the day, we got a bid for someone to skim-coat the ceilings. They are going to start some time this week.